Home | Windows | Doors | Stairs | News | Technical | Portfolio | About Us | Contact Us

Portfolio

See Also ...

Gloucester Quays

July 2010
As part of the £150 million development, various listed buildings were being renovated, requiring the design and manufacture of suitable windows and doors that would exactly match the building.

Portman Mews, Marylebone, London

July 2010
A £5.45m mixed-use commercial office and retail / restaurant development of around 2,200 sqm between Oxford Street and Portman Square in London.

A modern answer in timber

May 2008
Multifunctional designs were incorporated into thi s modern building, offering an appearance not normally achieved with timber.

Trailfinders Olympic Pavillion

September 2007
An impressive refurbishment of the Trailfinders Sports Club, London

Modern Houses in Brighton

April 2007
The supply of high quality, fully finished laminated oak windows and folding sliding doorsets for a stylish new build project of two modern homes in Brighton.

Beetham Tower

March 2007
The eye-catching Beetham Tower being the 2nd tallest building in the UK outside of London, shows how high rise living can be achieved

Garland Road Health Clinic

November 2006
A major renovation of the Garland Road Health Clinic in Greenwich, London.

Myddelton House

October 2006
Design and manufacture of the windows and doors in this modern building in the Lea Valley park area of Enfield.

Monks Park Primary Care Centre

October 2006
The design, manufacture and installation of windows and doors for new build primary health centre in the developing London borough of Wembley.

Old Burberry Factory

September 2006
Sliding Sash and Casement windows were supplied for the modernisation of the Old Burberry Factory in Littleport, Cambridgeshire

The Axis Development

June 2006
A major refurbishment of the old Co-operative building based in the heart of Nottingham. Strict requirements demanded by English Heritage.

Kings Cross

May 2006
As part of the reconstruction of the Kings Cross area, Barnsdale designed, manufactured and supplied a variety of windows to match existing styles.

Apartments in Spalding

May 2006
A major new development of apartments in Spalding. Flush casement windows were designed, manufactured and installed to give a traditional appearance.

Domestic Property - Surrey

July 2005
The design and manufacture of high quality timber windows and doors for the refurbishment of a picturesque domestic property in Surrey

Earls Court Station

December 2004
A major refurbishment of Earls Court tube station, with very strict requirements demanded by English Heritage.

Moss Lane School

September 2004
Replacement of windows to retain traditional look but with high performance and low long term maintenance. Upper sashes to be remotely operated.

Letchworth

July 2004
Design and manufacture of windows to match existing windows in this world famous Garden City.

The Knoll

June 2004
Poor performing U-PVC windows replaced with high performance, traditional looking timber sliding sash windows.

Holmes Place Health Club

April 2004
Design, manufacture and fitting of windows in an exclusive new health centre development.

Flag House

October 2003
Design, Manufacture and fitting of Windows to create a modern look on a traditional building, in an urban environment

Piccadilly

July 2003
Refurbishment of existing character building with windows to comply with the strict planning requirements of Westminster Council.

Mayfair

July 2002
One of the finest houses built in Mayfair during the last few years.

Denyer House

June 2002
The challenge of this project was to replace single glazed and draughty windows with double glazed units, whilst retaining the original look.

Buckinghamshire

May 2002
An exclusive modern home with nearby staff accommodation set in secluded grounds

Wilbraham Hotel

April 2002
A new building designed to look the same as the original, with very strict planning requirements.

Poundbury

August 2001
A very special new development as part of The Duchy of Cornwall architectural town in Dorset.

Cathedral Street

April 2001
Design, manufacture and installation of windows in this office building next to Southwark Cathedral, London.

Edenham Way

March 2001
Design and manufacture of 180 Europrofile Inward Opening windows for this Royal Borough of Chelsea and Kensington building of 46 apartments

Bishops Avenue

February 2001
A prestigious property situated on The Bishops Avenue in London using a selection of Barnsdale Windows and Doorsets, factory glazed and finished with Plant-on Bars.

Harrogate

November 2000
Design and manufacture of sliding sash windows and doorsets in this exclusive development in a most sensitive area of Harrogate.

Park Lane

April 2000
The replacement of all windows in a unique property in the heart of Mayfair, London.

Cromer

March 2000
Standard Barnsdale S2 Sliding Sash windows & DS5 Doorsets with adjustable hinges. All factory finished and glazed with Plant-On glazing bar to satisfy local Authority demands.

Chipperfield

March 2000
Standard Barnsdale designs specified for this extension to St Pauls Church in order to compliment the existing.

Holmbush

April 1998
Standard Barnsdale designs modified to suit the architects aesthetic requirements, whilst retaining the benefits of modern well designed and tested joinery.

Holbeach St Johns

March 1998
An adaption of our standard C2 Flush casement used to stunning effect in this barn conversion.

Stapleford Park

February 1998
Standard Barnsdale designs modified to blend in with a Grade 1 listed building, have high performance features & comply with fire authority requirements.

Clarendon Park

April 1997
Standard Barnsdale S2 spiral sliding sash windows & DS5 door sets. All factory finished & glazed with Plant-On glazing bar.

Littlecote

March 1997
Standard Barnsdale designs modified to comply with Planning Authority demands & to be practical in a hotel environment.

Amsterdam Hotel

February 1997
Standard Barnsdale S2 sliding sash windows & DS17 french door sets. All factory finished & glazed with Plant-On glazing bar.

Swallows Mill

February 1997
Two Standard Barnsdale Sash window designs with Plant-On Glazing Bars were used to convert a Grade 2 listed mill to dwellings and to comply with strict Planning Authority demands.